| 1 | DID2854L27 | Hospital Supply of (...Hospital Supply of ( 1) EUGENOL 110 ml, ( 2) ZINC OXIDE CEMENT 110 gm, (3) KETAC MOLAR CEMENT, (4) SHOFU COMPOSITE POLISHING BURS FOR AIROT, ( 5) GIC FOR CLASS V RESTORATIONS, (6) FLOWABLE COMPOSITE RESTORATION SHADE A1,(7) FLOWABLE COMPOSITE RESTORATION SHADE A2, ( 8) FLOWABLE COMPOSITE RESTORATION SHADE A3, ( 9) FLOWABLE COMPOSITE RESTORATION SHADEA3.5, ( 10) COMPOSITE FILLING MATERIAL SHADE A1, (11) COMPOSITE FILLING MATERIAL SHADE A2, (12) COMPOSITE FILLING MATERIAL SHADE A3, (13) COMPOSITE FILLING MATERIAL SHADE A3.5" | Duliajan | Yes | - | 14/10/2026 01:00 PM | 14/10/2026 01:00 PM | Details |
| 2 | DID2806L27 | KHAKI COLOUR CLOTH F...KHAKI COLOUR CLOTH FOR TROUSER & SHIRT. | Duliajan | Yes | - | 14/10/2026 01:00 PM | 14/10/2026 01:00 PM | Details |
| 3 | CDC2879L27 | Construction of 02 (...Construction of 02 (Two) additional classrooms for Bal Vatika, KV, Duliajan including all except cement. | Duliajan | - | - | 13/10/2026 11:00 AM | 13/10/2026 02:00 PM | Details |
| 4 | CDC2866L27 | Revamping of Existin...Revamping of Existing 1/2" Domestic Gas Lines with New Gas Lines from the 2" Main Line to Quarters & Bungalows of OIL Township, Moran. | Duliajan | No | - | 13/10/2026 11:00 AM | 13/10/2026 02:00 PM | Details |
| 5 | CGI2765L27 | Reconstruction of bo...Reconstruction of boundary fence (3.60 m height), approximate length 329.00 m at Numaligarh Terminal, OIL, Numaligarh Assam including supply of all materials. | Guwahati | No | - | 12/10/2026 11:00 AM | 12/10/2026 02:00 PM | Details |
| 6 | CDC2875L27 | Construction of Plin...Construction of Plinth, road over plinth, effluent pit, C.C./R.C.C. foundations to suit S-6 E-1400 Rig, for any location/ multiple locations/ cluster location at Moran & Lakwagaon area including supply of all plant, equipment and materials except cement and Bitumen drum sheet. | Duliajan | No | - | 08/10/2026 11:00 AM | 08/10/2026 02:00 PM | Details |
| 7 | CDC2848L27 | Development of the P...Development of the Parking Yard with 60 mm thick factory made cement concrete interlocking paver block in front of the G&R Building inside Industrial Area, OIL, Duliajan including supply of all materials except cement.. | Duliajan | No | - | 08/10/2026 11:00 AM | 08/10/2026 02:00 PM | Details |
| 8 | CDC2830L27 | Construction of Dust...Construction of Dust Free Approach Road with 1 layer of GSB, 1 layer of WBM with 80mm thick ICBP leading to Loc. DKC at Gelapukhuri area(Approx Length 810 Mtr) including supply of all materials except cement. | Duliajan | No | - | 01/10/2026 11:00 AM | 01/10/2026 02:00 PM | Details |
| 9 | CDC2805L27 | Construction of CC/R...Construction of CC/RCC mattress at Baghjan EPS including supply of all materials except cement. | Duliajan | No | - | 01/10/2026 11:00 AM | 01/10/2026 02:00 PM | Details |
| 10 | CDC2775L27 | Providing and fixing...Providing and fixing of PPGI sheet at roof after dismantling of the existing sheet including required structural steel work and painting at Receiving Section of Materials Department inside Industrial Area, Duliajan. | Duliajan | No | - | 01/10/2026 11:00 AM | 01/10/2026 02:00 PM | Details |