Sr. No. | Tender No | Title | Location/ Office | Pre-Bid Date | Bid Closing Date & Time | Bid Opening Date & Time | Details |
---|---|---|---|---|---|---|---|
1 | CDC0169P26 | Construction of 820 ...Construction of 820 mtr long Brick boundary wall of 3.6 Mtr Height & 0.6 mtr Y-hang Concertina Coil, around the Periphery of Production installation of WHS-LOC: HXR including supply of all materials by the Contractor except Cement, at Sessabil area, Dibrugarh. | Duliajan | - | 25-09-2025 / 11:00 AM | 25-09-2025 / 14:00 PM | Details |
2 | CDC0099P26 | Repair of road from ...Repair of road from NH-37 Makum Bypass to SCM 4 well to Barekuri OCS-QPS connecting road in Barekuri area by GSB, WBM, 40 mm thick SDBC work & replacing damaged culverts including supply of all equipment & materials. | Duliajan | - | 19-09-2025 / 11:00 AM | 19-09-2025 / 14:00 PM | Details |
3 | CDC0098P26 | Repair of road from ...Repair of road from Makum Bypass to Barekuri OCS plinth in Barekuri area by WBM, SDBC work & replacing damaged culverts including supply of all equipment & materials. | Duliajan | - | 19-09-2025 / 11:00 AM | 19-09-2025 / 14:00 PM | Details |
4 | CDC0051P26 | Construction of CC/R...Construction of CC/RCC foundation, Approach Road Development (Approx. length 750.00 Mtr),Construction of Plinth to suit VFD(E-2000) rig at any drilling location under Moran & Lakwagaon Demow area or any other area,including supply all material except cement and Bitumen drum sheet. | Duliajan | - | 11-09-2025 / 11:00 AM | 11-09-2025 / 14:00 PM | Details |
5 | CDC0050P26 | Construction of CC/ ...Construction of CC/ RCC foundation with Comboo pad,Development of Approach road of Approx. length 500.00 Mtr, Construction of Plinth to suit VFD(E-2000) rig at any drilling location at Shalmari, Tinali, Rajgarh area in Dibrugarh,including supply all material except cement and Bitumen drum sheet. | Duliajan | - | 11-09-2025 / 11:00 AM | 11-09-2025 / 14:00 PM | Details |
6 | SKI0017P26/P1 | Silver salvers with ...Silver salvers with Box | Kolkata | - | 09-09-2025 / 13:00 PM | 09-09-2025 / 13:30 PM | Details |
7 | CGI9827P26 | Construction of prec...Construction of precast boundary wall (length Approx 750 M) and Earth filling work for proposed CBG plant at Jorhat including Construction of road from Main Road to CBG plant at Jorhat (Approx. 380.00 M Length) | Guwahati | - | 09-09-2025 / 11:00 AM | 09-09-2025 / 14:00 PM | Details |