Upgradation of Helipad Ground Infrastructure through Construction of Footpaths with Interlocking Concrete Block Pavement (ICBP) and Replacement of Existing Jingle Fencing with Galvanized Iron (G.I.) Chain Link Fabric Fencing, Along with Electrification work (for an Approximate Length of 550.00 m.), including supply of all materials except Cement.