Repairing of Gravel approach road of 500 meter length,strengthening/Construction of plinth,Road over plinth,Effluent pit with suitable bundh/Embankment etc,Construction of C.C/R.C.C. Foundation with pillows to suit E-2000 rig outfit at any location or multiple locations in Makum & Hapjan area including supply of all materials except cement and empty bitumen drum sheet.