Laying/construction of 200mm NB diameter, approx. 3 KM long 3LPE coated COD pipeline from OCS-1 to Well-06 scraper trap, and 300mm NB diameter, approx. 2.2 KM long 3LPE coated gas distribution pipeline from OCS-1 to Burhi-Dihing river bridge under Western Fields in OIL's Operational Areas in the state of Assam.