As on

400.95

NSE

400.75

BSE
  • As on
  • 400.95NSE
  • 400.75BSE

Profile
Sr. No.Tender NoTitleTender CategoryPost DateDetails
4731CGI5428P21HIRING SERVICES OF O...HIRING SERVICES OF ONE NO.BRAND NEW MAHINDRA BOLERO 2 WHEELED DRIVE (MODEL: B-6 OR HIGHER MODEL) DIESEL DRIVEN, BS-VI OR LATEST COMPLIANCE, PLYING UNDER OIL, PS6, BONGAIGAON FOR A PERIOD OF FOUR (4) YEARS.National09-11-2020Details
4732SSG5347L21/02SPARK PLUGSSPARK PLUGSGlobal09-11-2020Details
4733CDC5573L21Construction of 6 (S...Construction of 6 (Six) nos of rooms with kitchen with common verandah, 2(Two) nos Toilet ,2(Two) Bath room, 1(One) Urinal with Septic Tank and Soakpit, Brick Security Hut along with site development and providing fencing around the entire well plinth for the Satellite Fire Station at Kumchai well no 2 and 13 plinth, Kumchai, Arunachal Pradesh.Limited07-11-2020Details
4734CDC5572L21Construction of new ...Construction of new Flare Pit at Langkashi OCS including supply of all materials except cement.Limited07-11-2020Details
4735CDC5571L21Construction of Bitu...Construction of Bituminous road from Lakhipather Panchayat Office to BGP#002 well entrance tinali with 100 mm thick GSB ,150 mm thick WBM , 25 mm SDBC and applying sealcoat including supply of all materials by the contractor except Cement .Total Length = 1.900 Kms.Limited07-11-2020Details
4736CDC5570L21Construction of Mud ...Construction of Mud Disposal pit at well plinth of MRN#64,including Supply of all materials except Cement, Bitumen, Jingle wire & HDPE sheets.Limited07-11-2020Details
4737CDC5576P21Construction of 760 ...Construction of 760 mtr long Brick Boundary wall around the Periphery of Production installation of WHS-LOC: MFK at Demow area with 12 feet Height & 2 feet Concertina Coil including supply of all materials by the Contractor except Cement.National07-11-2020Details
4738CDC5574P21Construction of Bitu...Construction of Bituminous Road from BGP#005 Well entrance to Lakhipathar - Digboi Main Road Tiniali by repairing WBM, laying 25mm thick SDBC and applying sealcoat including supply of all materials by the contractor except Cement . Total Length = 4.650 Kms.National07-11-2020Details
4739CGI5545P21Hiring the services ...Hiring the services of LMV Operator & Assistance to masonry job category at PS9. Dumar for a period of 4(four) years.National07-11-2020Details
4740SSH5148P21/03Supply of Gas Lift V...Supply of Gas Lift Valve & Redress Kits of various sizesNational07-11-2020Details