Raising height of th...Raising height of the boundary wall &
reconstruction of a damaged portion of the
boundary wall at RS 10, Pratapkhata
including supply of all materials.
Laying/replacement o...Laying/replacement of 100 mm NB , API
5 LX -46 welded flow lines on requirement basis for Drilling wells, Work over wells,
Water Injection lines, Formation water disposal lines, gas artery lines and 50 mm NB
welded gas pipelines in OIL's operational areas in the state of Assam and Arunachal
Pradesh.
Laying/replacement o...Laying/replacement of 100 mm NB , API
5 LX -46 welded flow lines on requirement basis for Drilling wells, Work over wells,
Water Injection lines, Formation water disposal lines, gas artery lines and 50 mm NB
welded gas pipelines in OIL's operational areas in the state of Assam and Arunachal
Pradesh.
Laying/replacement o...Laying/replacement of 100 mm NB , API
5 LX -46 welded flow lines on requirement basis for Drilling wells, Work over wells,
Water Injection lines, Formation water disposal lines, gas artery lines and 50 mm NB
welded gas pipelines under Eastern Asset in OIL's operational areas.