As on

500.45

NSE

499.85

BSE
  • As on
  • 500.45NSE
  • 499.85BSE

Limited Tenders

Profile
Last updated: 24/05/2026 03:18 PM

Archive Tenders (Limited Tenders)

Sr. No.Tender NoTitleLocation/ OfficeWeather FlaggedPre-Bid DateBid Closing Date & TimeBid Opening Date & TimeDetails
401SSI7299L25METHANOLMETHANOLDuliajanYes-18/09/2024 11:00 AM18/09/2024 02:00 PMDetails
402SSG7300L25Rock Bit, Size : 4.1...Rock Bit, Size : 4.1/8"DuliajanNo-18/09/2024 11:00 AM18/09/2024 02:00 PMDetails
403GCO7335L25Supply of flower Sap...Supply of flower Saplings, cowdung, bamboo, pesticide etc. for distribution within different location in PHQ for beautification of the colony during the year, 2024GuwahatiNo-17/09/2024 02:00 PM17/09/2024 02:00 PMDetails
404CDC7366L25Development of area ...Development of area by earth filling and hard standing with Granular Sub-Base (G.S.B.) & Gravelling for setting up of Surface Production Facility (S.P.F) at location DYF, Dikharipathar areaDuliajanNo-17/09/2024 11:00 AM17/09/2024 02:00 PMDetails
405KIS7320L25Spares for oil well ...Spares for oil well Triplex Plunger Pump.KolkataNo-10/09/2024 02:00 PM10/09/2024 02:00 PMDetails
406TPI00151INHiring the service o...Hiring the service of TPI for Inspection of 3-1/2" tubing (Qty. 4500 mtr.) & accessories as per QAPDuliajanNo-10/09/2024 11:00 AM10/09/2024 02:00 PMDetails
407DID7251L25Consumables of Patho...Consumables of Pathology LabDuliajanYes-04/09/2024 01:00 PM04/09/2024 01:00 PMDetails
408CGI7349L25Hiring the services ...Hiring the services of RoW/RoU Line Walking on limited tender basis by line walking method under Pump Station 1 Duliajan for a period of one year from 01.09.2024 to 31.08.2025 for the following segments:1.PL KM 0.0 km to 34.0 km of Naharkatia Barauni crude oil pipeline (NBPL) 2.PL KM 0.0 km to 38 km of Digboi Duliajan crude oil pipeline(DDPL) 3.PL KM 0.0 km to 22 km for TSPL 4.Optical Fiber Cable (OFC) route for TPS from PL KM 0.0 km to 27kmGuwahatiNo-04/09/2024 11:00 AM04/09/2024 02:00 PMDetails
409SSG7029L25PDC BitsPDC BitsDuliajanNo-04/09/2024 11:00 AM04/09/2024 02:00 PMDetails
410CDC7267L25Improvement of the R...Improvement of the Ring Road and the Approach Road to the office building (Total length of road 1150.0 mtr., width 3.75 mtr.) by 150 mm GSB, 75 mm WBM (2-layers) and 25 mm thk. SDBC, including supply of all materials at OCS-1, Moran, Charaideo districtDuliajanNo-03/09/2024 11:00 AM03/09/2024 02:00 PMDetails