| 301 | CDC8537L25 | Construction of grav...Construction of gravel approach road (25.00 mtrs.), construction of plinth, road over plinth, effluent pits with suitable bundhs/embankment etc,cleaning of plinth, construction CC/RCC foundations with pillow foundation to Suit DM-05 rig out fit at WDW 238, Kathalguri & for any other location in CF-East area including supply of all materials except cement | Duliajan | No | - | 25/02/2025 11:00 AM | 25/02/2025 02:00 PM | Details |
| 302 | CDC8536L25 | Development of Anajo...Development of Anajori Path near Tipling (approx. length= 0.380 KM) and Medhi Path near Kamalabari area (approx. length= 0.095 KM)" with 150 mm thick Granular Sub Base (GSB) and 150 mm thick Water Bound Macadam (WBM) with 40 mm thick Semi Dense Bituminous Concrete (SDBC) including supply of all materials except cement | Duliajan | No | - | 25/02/2025 11:00 AM | 25/02/2025 02:00 PM | Details |
| 303 | CDC8531L25 | Earth filling in the...Earth filling in the existing effluent pits located inside OCS-02, western asset including necessary dismantling of brick boundary wall and reconstruction of the same after completion of earth filling job. | Duliajan | No | - | 21/02/2025 11:00 AM | 21/02/2025 02:00 PM | Details |
| 304 | GOD8197L25 | COPPER BONDED ELECTR...COPPER BONDED ELECTRODE, EARTHING COMPOUND, INSTALLATION AND COMMISSIONING | Guwahati | Yes | - | 20/02/2025 01:00 PM | 20/02/2025 01:00 PM | Details |
| 305 | DID8359L25 | Consumables of Patho...Consumables of Pathology Lab | Duliajan | Yes | - | 19/02/2025 01:00 PM | 19/02/2025 01:00 PM | Details |
| 306 | CGI8474L25 | Civil works at Numal...Civil works at Numaligarh Terminal including supply of all materials: (i) Painting of office buildings, Godown, Substation building, Telecom building, Control room, wall/fence, residential buildings (only exterior area), along with incidental repairing works (ii) Replacement of existing Steel Gate inside Numaligarh Terminal | Guwahati | No | - | 14/02/2025 11:00 AM | 14/02/2025 02:00 PM | Details |
| 307 | CGI8265L25 | RENOVATION OF EXISTI...RENOVATION OF EXISTING PIPELINER'S CO-OPERATIVE SOCIETY BUILDING(S) AT PHQ GUWAHATI INCLUDING ELECTRICAL WORKS AND SUPPLY OF ALL MATERIALS EXCEPT CEMENT | Guwahati | No | - | 14/02/2025 11:00 AM | 14/02/2025 02:00 PM | Details |
| 308 | CKI8525L25 | Hiring Security Serv...Hiring Security Services for Round the Clock (24 x 7) basis of Un-Armed Guards (Male) under Works Contract Labour in the Watch and Ward (Without Arm-Unlisted) category at Brooklyn Godown and Shipping Office of Oil India Limited, Kolkata Office. | Kolkata | No | - | 13/02/2025 11:00 AM | 13/02/2025 02:00 PM | Details |
| 309 | CDC8398L25 | Construction of Grav...Construction of Gravelled Road from the junction point of River Bundh to NHK 353 & from the junction point of NHK 353 to NHK 291. Total Estimated Cost Rs. 39,11,388.75 (Contract Execution cost is Rs. 37,75,471.77 and Forest Royalty component is Rs. 1,35,916.98) | Duliajan | No | - | 11/02/2025 11:00 AM | 11/02/2025 02:00 PM | Details |
| 310 | CGI8310L25 | Re-Tar felting work ...Re-Tar felting work of staff guest house; employee club; A3, A4, A5, A6, A7, BX1, BX2, B1, B2, C1, C2 Quarters; D plus 1, D plus 2 & F1 Bungalows at Domestic area PS10, Barauni | Guwahati | No | - | 11/02/2025 11:00 AM | 11/02/2025 02:00 PM | Details |