| Sr. No. | Tender No | Title | Location/ Office | Weather Flagged | Pre-Bid Date | Bid Closing Date & Time | Bid Opening Date & Time | Details |
|---|---|---|---|---|---|---|---|---|
| 21 | CDT1558L26 | Hiring the services ...Hiring the services of 34 (thirty-four) Nos. readily available 42-48 seater fully built diesel buses for a period of 06(six) months. | Duliajan | Yes | - | 21/04/2026 11:00 AM | 21/04/2026 02:00 PM | Details |
| 22 | CDC1586L26 | Construction of New ...Construction of New RCC framed Brick Boundary Wall of 230mm thick upto a height of 0.60m and 2.50m height of Weldmesh Fence Panel by dismantling of old Jingle Wire Fench at Golf Course area, Duliajan including supply of all materials except cement | Duliajan | No | - | 16/04/2026 11:00 AM | 16/04/2026 02:00 PM | Details |
| 23 | CDT1540L26 | Hiring the services ...Hiring the services of 60 (sixty) Nos. readily available 24-28 seater fully built diesel buses for a period of 06 (six) months. | Duliajan | Yes | - | 16/04/2026 11:00 AM | 16/04/2026 02:00 PM | Details |
| 24 | GEM/2026/B/7353430 | Hiring services of C...Hiring services of Cyber Security Audit for Operational Technology (OT) system across Oil India Limited. | Duliajan | No | - | 10/04/2026 02:00 PM | 10/04/2026 02:30 PM | Details |
| 25 | GEM/2026/B/7394686 | Hiring services of O...Hiring services of Operation and Maintenance for Drilling of Water Disposal Wells (WDW) for a period of 6(Six) month. | Duliajan | No | - | 06/04/2026 02:00 PM | 06/04/2026 02:30 PM | Details |
| 26 | CDC1514L26 | Blacktopping and St...Blacktopping and Strengthening of road from Garumorajan Bridge to Rupohi Konwar Gaon road (DBY-NHK road to Ushapur OCS road) (Total Length=1.20 Kms.) by Earth filling, GSB laying, two layers of WBM, laying & 40 MM thick SDBC including supply of all materials except cement. | Duliajan | No | - | 02/04/2026 11:00 AM | 02/04/2026 02:00 PM | Details |
| 27 | CDC1410L26 | Replacement of exist...Replacement of existing CGI Sheet roof with PUF panel at ICE workshop inside Industrial area including of supply of all materials. | Duliajan | No | - | 02/04/2026 11:00 AM | 02/04/2026 02:00 PM | Details |
| 28 | CDC1486L26 | Construction/repairi...Construction/repairing of Approach road, repairing and extension of hardstanding area of the plinth, dewatering, removal of mud of the effluent pit and construction of CC/ RCC foundation to suit DM-5 rig for cluster plinth of any or multiple locations in Makum & Hapjan area in Tinsukia District, including supply of all materials except cement and Bitumen drum sheets. | Duliajan | No | - | 31/03/2026 11:00 AM | 31/03/2026 02:00 PM | Details |
| 29 | CDC1482L26 | Revamping/ Re constr...Revamping/ Re construction of 1300 meter long approach Road from Dhekiajan Tiniali to Loc. HAAX as dust free road by single layer of 75mm thick WBM, applying prime coat, tack coat & 40 mm SDBC, including supply of all materials by contractor. | Duliajan | No | - | 31/03/2026 11:00 AM | 31/03/2026 02:00 PM | Details |
| 30 | CDC1471L26 | Revamping of approac...Revamping of approach road to Pontoon GIS substation(near Dihing Bridge, Naharkatia) with 150mm WBM & 40mm thick SDBC. | Duliajan | No | - | 31/03/2026 11:00 AM | 31/03/2026 02:00 PM | Details |