| 161 | CDC8849L25 | Replacement of old A...Replacement of old Asbestos sheet roofing with Pre-coated Galvanised Iron (PPGI) sheets including replacement of Rain water pipes at 07 nos. DZ-type bungalows including supply of all materials at OIL Township, Moran, Charaideo. Total Estimated cost Rs. 57,31,069.75 | Duliajan | No | - | 08-04-2025 / 11:00 AM | 08-04-2025 / 14:00 PM | Details |
| 162 | CDC8860L25 | Construction of oper...Construction of operators' room at Hapjan GCS including supply of all materials except cement. Total Estimated Cost Rs.1561830.59 (Execution cost Rs.1543310.86 and Forest Royalty component Rs.18519.73). | Duliajan | No | - | 08-04-2025 / 11:00 AM | 08-04-2025 / 14:00 PM | Details |
| 163 | CGI8614L25 | REPAIRING & RENO...REPAIRING & RENOVATION OF STAFF GUEST HOUSE INCLUDING PERIMETER FENCE / GARAGES / DRAINS / FOOTPATHS ETC. AT PS01, DULIAJAN INCLUDING SUPPLY OF ALL MATERIALS, EXCEPT TARFELT AND BITUMEN | Guwahati | No | - | 08-04-2025 / 11:00 AM | 08-04-2025 / 14:00 PM | Details |
| 164 | CDC8765L25 | Development of appro...Development of approach road to Well No. MKM 50 at Makum area by GSB, WBM & SDBC work including supply of all equipment & materials. | Duliajan | No | - | 03-04-2025 / 11:00 AM | 03-04-2025 / 14:00 PM | Details |
| 165 | DID8712L25 | Gauze (100cm x 16mtr...Gauze (100cm x 16mtr x 400 gm) and Cotton wool (400 gm) for hospital use | Duliajan | Yes | - | 02-04-2025 / 13:00 PM | 02-04-2025 / 13:00 PM | Details |
| 166 | CDC8794L25 | Supply and filling w...Supply and filling with outsourced selected earth in 2 no.s of pits including necessary compaction and grading the surface up to required level at WHS:DGD in Rajgarh area of Dibrugarh District. | Duliajan | No | - | 02-04-2025 / 11:00 AM | 02-04-2025 / 14:00 PM | Details |
| 167 | CDC8768L25 | Construction of 6 (s...Construction of 6 (six) nos. of RCC Security Watch Towers inside Manabhum Camp, Arunachal Pradesh including supply of all materials by the contractor except cement. Total Estimated Cost Rs. 68,97,871.33 excluding PF and GST | Duliajan | No | - | 27-03-2025 / 11:00 AM | 27-03-2025 / 14:00 PM | Details |
| 168 | CDC8759L25 | Repairing of 2.5 km ...Repairing of 2.5 km long approach road from Barekuri OCS plinth to Barekuri QPS by GSB, WBM, Premix with seal-coating including supply of all equipment & materials except Bitumen. Total Estimated Cost Rs. 13,977,283.40 (Execution cost Rs. 1,34,91,586.29 and Forest Royalty component Rs. 485,697.11) | Duliajan | No | - | 27-03-2025 / 11:00 AM | 27-03-2025 / 14:00 PM | Details |
| 169 | CDC8757L25 | Repairing of 1.0 km ...Repairing of 1.0 km long approach road from BRK 26 plinth to BRK 11 plinth by GSB, WBM, Premix with seal-coating including supply of all equipment & materials except Bitumen. Total Estimated Cost Rs. 56,48,856.69 (Execution cost Rs. 54,52,564.37 and Forest Royalty component Rs.1,96,292.32) | Duliajan | No | - | 27-03-2025 / 11:00 AM | 27-03-2025 / 14:00 PM | Details |
| 170 | DID8726L25 | Supply and installat...Supply and installation of 3D ACRYLIC LETTERS, Display Boards with new OIL Logo & Sectional Plates | Duliajan | Yes | - | 26-03-2025 / 13:00 PM | 26-03-2025 / 13:00 PM | Details |