| Sr. No. | Tender No | Title | Location/ Office | Weather Flagged | Pre-Bid Date | Bid Closing Date & Time | Bid Opening Date & Time | Details |
|---|---|---|---|---|---|---|---|---|
| 141 | CDC9068L26 | Construction of Flar...Construction of Flare Pit wall at Barekuri QPS area with RCC Pond Including supply of all materials except Cement.Total Estimated Cost Rs 13664549.81(Execution cost Rs 13344286.92 and Forest Royalty component Rs 320262.89). | Duliajan | No | - | 06-05-2025 / 11:00 AM | 06-05-2025 / 14:00 PM | Details |
| 142 | G349054L26 | Hiring services of g...Hiring services of grass cutting and upkeepment of open area at Numaligarh Terminal for a period of 1(One) year w.e.f. 20.08.2025 to 19.08.2026 and extendable by another 1(One) year. | Numaligarh | No | - | 02-05-2025 / 11:00 AM | 02-05-2025 / 14:00 PM | Details |
| 143 | CDC9059L26 | Repairing /Strengthe...Repairing /Strengthening of the Internal roads with laying of paver block at a stretch of 1.5 KM approx and the remaining 1.2 KM approx with 40mm thick SDBC ,Tengakhat ITF ,including supply of all materials except Cement. | Duliajan | No | - | 29-04-2025 / 11:00 AM | 29-04-2025 / 14:00 PM | Details |
| 144 | CDC9057L26 | Construction of dust...Construction of dust free approach road leading to well No.NHK#603( L-1300.00 M) by 150mm GSB ,75 MM two layer WBM & 40mm SDBC. All materials supplied by contractor except cement. | Duliajan | No | - | 29-04-2025 / 11:00 AM | 29-04-2025 / 14:00 PM | Details |
| 145 | CDC9042L26 | Repairing of CISF Ba...Repairing of CISF Barracks which includes replacement of CGI sheet (through PPGL),ceiling,repairing of floor area of barracks,fixing of gates,(Vide Ref.No. PSS/ITF/Civil/24-113 Dated.09.09.2024).All materials supplied by contractor except cement. | Duliajan | No | - | 24-04-2025 / 11:00 AM | 24-04-2025 / 14:00 PM | Details |
| 146 | SSH8865L25 | SPARES FOR BHEL TYPE...SPARES FOR BHEL TYPE E-1400 DRAWWORKS | Duliajan | Yes | - | 23-04-2025 / 11:00 AM | 23-04-2025 / 14:00 PM | Details |
| 147 | SSG8863L25 | SPARES FOR E-1400 DR...SPARES FOR E-1400 DRAWWORKS | Duliajan | Yes | - | 23-04-2025 / 11:00 AM | 23-04-2025 / 14:00 PM | Details |
| 148 | SSG8836L25 | SPARES FOR BHEL TYPE...SPARES FOR BHEL TYPE E-1400 DRAWWORKS | Duliajan | Yes | - | 23-04-2025 / 11:00 AM | 23-04-2025 / 14:00 PM | Details |
| 149 | CDC9032L26 | Construction of the ...Construction of the approach road, plinth and foundation to Suit S-1 to S-7 Rig outfit on Cluster basis for any Location in Tangakhat & Chabua area or any area under CENTRAL FIELD WEST in Dibrugarh District ,including supply all material except cement and Bitumen drum sheets. | Duliajan | No | - | 22-04-2025 / 11:00 AM | 22-04-2025 / 14:00 PM | Details |
| 150 | CDC8991L26 | Construction of Stor...Construction of Storm water drains for new production facility inside Barekuri QPS with supply of all materials except cement. Total Estimated Cost Rs. 3790703.22 (Execution cost Rs. 3701858.61and Forest Royalty component Rs. 88844.61). | Duliajan | No | - | 22-04-2025 / 11:00 AM | 22-04-2025 / 14:00 PM | Details |