| सीरीयल नम्बर | निविदा नंबर | शीर्षक | स्थान/कार्यालय | बोली पूर्व तारीख | बोली बंद करने की तारीख और समय | बोली खोलने की तारीख और समय | विवरण |
|---|---|---|---|---|---|---|---|
| 1 | CDG0818P26 | Charter Hire of 01 (...Charter Hire of 01 (One) Number of 2000 HP (Minimum) Brand New Drilling Rig Package (with Top Drive) for a period of 06 (Six) years. | Duliajan | 26-12-2025 | 13-01-2026 / 11:00 AM | 13-01-2026 / 14:00 PM | विवरण |
| 2 | CDG0791P26 | Charter Hire of 02 (...Charter Hire of 02 (Two) Numbers of 2000 HP (Minimum) Drilling Rig Package (with Top Drive). | Duliajan | 22-12-2025 | 08-01-2026 / 11:00 AM | 08-01-2026 / 14:00 PM | विवरण |
| 3 | CDG0589P26 | HIRING OF 05 NOS. OF...HIRING OF 05 NOS. OF WIRELINE LOGGING UNITS WITH SERVICES. | Duliajan | 10-12-2025 | 06-01-2026 / 11:00 AM | 06-01-2026 / 14:00 PM | विवरण |
| 4 | SDG0516P26 | Hot Oil Circulation ...Hot Oil Circulation cum High Pressure Pumping Unit,Qty=1 No. | Duliajan | 20-11-2025 | 16-01-2026 / 11:00 AM | 16-01-2026 / 13:00 PM | विवरण |
| 5 | SDG0515P26 | Multi-Purpose Pumpin...Multi-Purpose Pumping Unit,Qty =1 No. | Duliajan | 20-11-2025 | 16-01-2026 / 11:00 AM | 16-01-2026 / 13:00 PM | विवरण |
| 6 | SDG0510P26 | Coiled Tubing unit,Q...Coiled Tubing unit,Qty =1 No. | Duliajan | 20-11-2025 | 16-01-2026 / 11:00 AM | 16-01-2026 / 13:00 PM | विवरण |
| 7 | SDG0344P26 | Procurement of Suppl...Procurement of Supply of Open Hole Logging units with Tools and accessories alongwith Installation & Commissioning,Training and AMC (Non Comprehensive) for 10 years. | Duliajan | 30-10-2025 | 31-12-2025 / 11:00 AM | 31-12-2025 / 13:00 PM | विवरण |
| 8 | CDG0167P26 | Charter Hire of one ...Charter Hire of one (01) number of 3000 HP Drilling Rig Package in Assam and Arunachal Pradesh. | Duliajan | 16-09-2025 | 08-01-2026 / 11:00 AM | 08-01-2026 / 14:00 PM | विवरण |
| 9 | CJG0198P26 | Gas Sweetening Unit ...Gas Sweetening Unit (GSU) Of Capacity 0.5 MMMSCMD for Removing the Carbon Dioxide Component from the Natural Gas for Gas Sequestration at Dandewala Gas Processing Complex on LSTK Basis Through EPC Mode of Execution in a Period of 20 Months with an Operation & Maintenance (O&M) of the plant for a Period of Two Years and Provision of Extension by Another One Year. | Jodhpur | 24-09-2025 | 19-01-2026 / 11:00 AM | 19-01-2026 / 15:00 PM | विवरण |
| 10 | CDG7880P25 | Hiring of Integrated...Hiring of Integrated Drilling Service-Sadiya (IDS-S) along with supply of manpower, equipment & consumables under a single contract for a period of 01 (One) year and extendable by another 01 (one) year for drilling one well in Sadiya block (AA-ONN-2010/3) with a provision of another one well in Assam/ Arunachal Pradesh | Duliajan | 27-11-2024 | 30-12-2025 / 11:00 AM | 30-12-2025 / 14:00 PM | विवरण |
- 1