Construction of CC/ RCC foundation,Retaining wall (Approx. length 580.00 Mtr) of Approach Road Development (Approx. length 3600.00 Mtr),Construction of Plinth to suit VFD(E-2000) rig at any drilling location under Moran & Lakwagaon Demow area or any other area,including supply all material except cement and Bitumen drum sheet.