Repairing of pot holes with premixing developed at the existing approach road of 4.6km long, originating from the Junction point of NH-214 at 10th mile Stone leading to Loc GDK#1,Gedellanka under Mummidivaram Mandal with light jungle cutting repairing of side berm including supply of all materials and machinery.