| सीरीयल नम्बर | निविदा नंबर | शीर्षक | स्थान/कार्यालय | चिह्नित किए गए ? | बोली पूर्व तारीख | बोली बंद करने की तारीख और समय | बोली खोलने की तारीख और समय | विवरण |
|---|---|---|---|---|---|---|---|---|
| 371 | CJI7145L25 | Hiring of services f...Hiring of services for furnishing of South Block of OIL Executive Residential Complex-Jodhpur in a limited duration of 06(Six) Months | Jodhpur | Yes | - | 16-08-2024 / 11:00 AM | 16-08-2024 / 15:00 PM | विवरण |
| 372 | SSG6865L25 | Procurement of Spare...Procurement of Spares for Hydraulic Power Casing Tong International Competitive Bidding (ICB) | Duliajan | Yes | - | 14-08-2024 / 11:00 AM | 14-08-2024 / 14:00 PM | विवरण |
| 373 | CDC7099L25 | Development of the ...Development of the road near cluster well plinth of (MTN#04,MTN#05,MTN#06 & MTN#07) under DIAN QPS of length 460.00 M (approx)Ref. All materials to be supplied by contractor except cement | Duliajan | No | - | 14-08-2024 / 11:00 AM | 14-08-2024 / 14:00 PM | विवरण |
| 374 | CDC7131L25 | Development of area ...Development of area by approximately 1.0 mtr. earth filling including hard standing with Granular Sub-Base (G.S.B.) & Gravelling for setting up of Surface Production Facility (S.P.F) at location MGL/MGK, Lakwagaon area, Sivasagar | Duliajan | No | - | 14-08-2024 / 11:00 AM | 14-08-2024 / 14:00 PM | विवरण |
| 375 | CDC7136L25 | Construction of New ...Construction of New Drenching Pump House with PPGI sheet at Top (Building Dimensions L: 12.8 Meters & B: 7.85 Meters & H: 5 Meters) along with construction of peripheral drains, peripheral walkway & frontal ramp at Langkashi OCS under JNK area including supply of all materials except Cement | Duliajan | No | - | 14-08-2024 / 11:00 AM | 14-08-2024 / 14:00 PM | विवरण |
| 376 | CGI6798L25 | CONSTRUCTION OF PATH...CONSTRUCTION OF PATHWAYS AT SOLAR PANEL AREA INSIDE PS-3, JORHAT INCLUDING SUPPLY OF ALL MATERIALS | Guwahati | No | - | 13-08-2024 / 11:00 AM | 13-08-2024 / 14:00 PM | विवरण |
| 377 | CDC7033L25 | Construction of the ...Construction of the approach road plinth and foundation to Suit S-1 to S-7 Rig outfit on Cluster basis for any Location in Tangakhat & Chabua area or any area under CENTRAL FIELD WEST in Dibrugarh District including supply all material except cement and Bitumen drum sheet | Duliajan | No | - | 13-08-2024 / 11:00 AM | 13-08-2024 / 14:00 PM | विवरण |
| 378 | CDC7034L25 | Construction of the ...Construction of the approach road, plinth and foundation to Suit S-1 to S-7 Rig outfit on Cluster basis for any Location in Tangakhat & Chabua area or any area under CENTRAL FIELD WEST in Dibrugarh District ,including supply all material except cement and Bitumen drum sheet | Duliajan | No | - | 13-08-2024 / 11:00 AM | 13-08-2024 / 14:00 PM | विवरण |
| 379 | CDC7030L25 | Construction of boun...Construction of boundary wall, approach road and operator room cum IM room by earth filling the low laying area for placement of In-house Gas compressor inside Dikom GCS | Duliajan | No | - | 13-08-2024 / 11:00 AM | 13-08-2024 / 14:00 PM | विवरण |
| 380 | CDC7073L25 | Construction of secu...Construction of security barrack for placement of static security at BGN 14 well plinth including toilet block, security morcha (02 nos. of permanent and 02 nos. of temporary), footpath and jingular wire fencing all around the plinth including supply of all materials except cement, jingle wire and second hand pipe post | Duliajan | No | - | 13-08-2024 / 11:00 AM | 13-08-2024 / 14:00 PM | विवरण |