तक

450.50

NSE

450.00

BSE
  • तक
  • 450.50NSE
  • 450.00BSE

सीमित निविदाएँ

Profile
Last updated: 25/07/2026 07:52 AM

निविदा की अन्य जानकारी

पुरालेख निविदाएँ (सीमित निविदाएँ)

सीरीयल नम्बरनिविदा नंबरशीर्षकस्थान/कार्यालयचिह्नित किए गए ?बोली पूर्व तारीखबोली बंद करने की तारीख और समयबोली खोलने की तारीख और समयविवरण
281CDC8768L25Construction of 6 (s...Construction of 6 (six) nos. of RCC Security Watch Towers inside Manabhum Camp, Arunachal Pradesh including supply of all materials by the contractor except cement. Total Estimated Cost Rs. 68,97,871.33 excluding PF and GSTडुलियाजानNo-27/03/2025 11:00 AM27/03/2025 02:00 PMविवरण
282CDC8759L25Repairing of 2.5 km ...Repairing of 2.5 km long approach road from Barekuri OCS plinth to Barekuri QPS by GSB, WBM, Premix with seal-coating including supply of all equipment & materials except Bitumen. Total Estimated Cost Rs. 13,977,283.40 (Execution cost Rs. 1,34,91,586.29 and Forest Royalty component Rs. 485,697.11)डुलियाजानNo-27/03/2025 11:00 AM27/03/2025 02:00 PMविवरण
283CDC8757L25Repairing of 1.0 km ...Repairing of 1.0 km long approach road from BRK 26 plinth to BRK 11 plinth by GSB, WBM, Premix with seal-coating including supply of all equipment & materials except Bitumen. Total Estimated Cost Rs. 56,48,856.69 (Execution cost Rs. 54,52,564.37 and Forest Royalty component Rs.1,96,292.32)डुलियाजानNo-27/03/2025 11:00 AM27/03/2025 02:00 PMविवरण
284DID8726L25Supply and installat...Supply and installation of 3D ACRYLIC LETTERS, Display Boards with new OIL Logo & Sectional PlatesडुलियाजानYes-26/03/2025 01:00 PM26/03/2025 01:00 PMविवरण
285DID8724L25LOPE PILE SYNTHETIC ...LOPE PILE SYNTHETIC CARPETडुलियाजानYes-26/03/2025 01:00 PM26/03/2025 01:00 PMविवरण
286DID8668L25Medical ConsumablesMedical ConsumablesडुलियाजानYes-26/03/2025 01:00 PM26/03/2025 01:00 PMविवरण
287DID8666L25DIALYSERDIALYSERडुलियाजानYes-26/03/2025 01:00 PM26/03/2025 01:00 PMविवरण
288CDC8742L25Construction of five...Construction of five(5) numbers of RCC watch towers at Hapjan OCS & GCS including supply of all materials except cement. Total Estimated Cost Rs 66,76,961.28 (Execution cost Rs 65,20,470.00 and Forest Royalty component Rs 1,56,491.28)डुलियाजानNo-25/03/2025 11:00 AM25/03/2025 02:00 PMविवरण
289CDC8658L25Repairing of 1.0 km ...Repairing of 1.0 km long approach road from BRK 26 plinth to BRK 10 road junction by GSB, WBM, Premix with seal-coating including supply of all equipment & materials except Bitumen. Total Estimated Cost Rs. 56,48,856.69 (Execution cost Rs. 54,52,564.37 and Forest Royalty component Rs.1,96,292.32)डुलियाजानNo-25/03/2025 11:00 AM25/03/2025 02:00 PMविवरण
290CDC8678L25Repair of road from ...Repair of road from BRK 4 to Torajan Metal bridge in Barekuri area by WBM, SDBC work & replacing damaged culverts including supply of all equipment & materials.डुलियाजानNo-20/03/2025 11:00 AM20/03/2025 02:00 PMविवरण