तक

477.65

NSE

477.80

BSE
  • तक
  • 477.65NSE
  • 477.80BSE

सीमित निविदाएँ

Profile
Last updated: 24 Mar, 2026 09:35 AM

निविदा की अन्य जानकारी

पुरालेख निविदाएँ (सीमित निविदाएँ)

सीरीयल नम्बरनिविदा नंबरशीर्षकस्थान/कार्यालयचिह्नित किए गए ?बोली पूर्व तारीखबोली बंद करने की तारीख और समयबोली खोलने की तारीख और समयविवरण
231DID8712L25Gauze (100cm x 16mtr...Gauze (100cm x 16mtr x 400 gm) and Cotton wool (400 gm) for hospital useडुलियाजानYes-02-04-2025 / 13:00 PM02-04-2025 / 13:00 PMविवरण
232CDC8794L25Supply and filling w...Supply and filling with outsourced selected earth in 2 no.s of pits including necessary compaction and grading the surface up to required level at WHS:DGD in Rajgarh area of Dibrugarh District.डुलियाजानNo-02-04-2025 / 11:00 AM02-04-2025 / 14:00 PMविवरण
233CDC8768L25Construction of 6 (s...Construction of 6 (six) nos. of RCC Security Watch Towers inside Manabhum Camp, Arunachal Pradesh including supply of all materials by the contractor except cement. Total Estimated Cost Rs. 68,97,871.33 excluding PF and GSTडुलियाजानNo-27-03-2025 / 11:00 AM27-03-2025 / 14:00 PMविवरण
234CDC8759L25Repairing of 2.5 km ...Repairing of 2.5 km long approach road from Barekuri OCS plinth to Barekuri QPS by GSB, WBM, Premix with seal-coating including supply of all equipment & materials except Bitumen. Total Estimated Cost Rs. 13,977,283.40 (Execution cost Rs. 1,34,91,586.29 and Forest Royalty component Rs. 485,697.11)डुलियाजानNo-27-03-2025 / 11:00 AM27-03-2025 / 14:00 PMविवरण
235CDC8757L25Repairing of 1.0 km ...Repairing of 1.0 km long approach road from BRK 26 plinth to BRK 11 plinth by GSB, WBM, Premix with seal-coating including supply of all equipment & materials except Bitumen. Total Estimated Cost Rs. 56,48,856.69 (Execution cost Rs. 54,52,564.37 and Forest Royalty component Rs.1,96,292.32)डुलियाजानNo-27-03-2025 / 11:00 AM27-03-2025 / 14:00 PMविवरण
236DID8726L25Supply and installat...Supply and installation of 3D ACRYLIC LETTERS, Display Boards with new OIL Logo & Sectional PlatesडुलियाजानYes-26-03-2025 / 13:00 PM26-03-2025 / 13:00 PMविवरण
237DID8724L25LOPE PILE SYNTHETIC ...LOPE PILE SYNTHETIC CARPETडुलियाजानYes-26-03-2025 / 13:00 PM26-03-2025 / 13:00 PMविवरण
238DID8668L25Medical ConsumablesMedical ConsumablesडुलियाजानYes-26-03-2025 / 13:00 PM26-03-2025 / 13:00 PMविवरण
239DID8666L25DIALYSERDIALYSERडुलियाजानYes-26-03-2025 / 13:00 PM26-03-2025 / 13:00 PMविवरण
240CDC8742L25Construction of five...Construction of five(5) numbers of RCC watch towers at Hapjan OCS & GCS including supply of all materials except cement. Total Estimated Cost Rs 66,76,961.28 (Execution cost Rs 65,20,470.00 and Forest Royalty component Rs 1,56,491.28)डुलियाजानNo-25-03-2025 / 11:00 AM25-03-2025 / 14:00 PMविवरण