तक

464.10

NSE

464.50

BSE
  • तक
  • 464.10NSE
  • 464.50BSE

सीमित निविदाएँ

Profile
Last updated: 24 Mar, 2026 09:35 AM

निविदा की अन्य जानकारी

पुरालेख निविदाएँ (सीमित निविदाएँ)

सीरीयल नम्बरनिविदा नंबरशीर्षकस्थान/कार्यालयचिह्नित किए गए ?बोली पूर्व तारीखबोली बंद करने की तारीख और समयबोली खोलने की तारीख और समयविवरण
201CGI9052L26PROVIDING CIVIL MISC...PROVIDING CIVIL MISCELLANEOUS MAINTENANCE FOR NECESSARY WELDING AND FABRICATION JOBS AT DOMESTIC & INDUSTRY AREA UNDER PS8, SONAPURगुवाहाटीNo-13-05-2025 / 11:00 AM13-05-2025 / 14:00 PMविवरण
202CGI9051L26Miscellaneous mainte...Miscellaneous maintenance, painting, plumbing, masonry & repair jobs at Industrial & Domestic area PS7 Madarihat (For 2 years)गुवाहाटीNo-13-05-2025 / 11:00 AM13-05-2025 / 14:00 PMविवरण
203CGI9049L26Repair of storm wate...Repair of storm water drain with proper longitudinal gradient & side slopes at domestic area of PS7 Madarihat.गुवाहाटीNo-13-05-2025 / 11:00 AM13-05-2025 / 14:00 PMविवरण
204G029055L26Replacement of exist...Replacement of existing asbestos sheet roofing with PPGI sheet roofing including renovation and miscellaneous repairs at badminton court PS8 SonapurगुवाहाटीNo-09-05-2025 / 14:00 PM09-05-2025 / 14:10 PMविवरण
205TPI00170KGHiring of Third-Part...Hiring of Third-Party Inspection (TPI) Agency servicesकाकीनाडाNo-09-05-2025 / 13:00 PM09-05-2025 / 15:00 PMविवरण
206DID9079L26Disposable bed sheet...Disposable bed sheet with pillow cover for hospital useडुलियाजानYes-07-05-2025 / 13:00 PM07-05-2025 / 13:00 PMविवरण
207CDC9068L26Construction of Flar...Construction of Flare Pit wall at Barekuri QPS area with RCC Pond Including supply of all materials except Cement.Total Estimated Cost Rs 13664549.81(Execution cost Rs 13344286.92 and Forest Royalty component Rs 320262.89).डुलियाजानNo-06-05-2025 / 11:00 AM06-05-2025 / 14:00 PMविवरण
208G349054L26Hiring services of g...Hiring services of grass cutting and upkeepment of open area at Numaligarh Terminal for a period of 1(One) year w.e.f. 20.08.2025 to 19.08.2026 and extendable by another 1(One) year.नुमालीगढ़No-02-05-2025 / 11:00 AM02-05-2025 / 14:00 PMविवरण
209CDC9059L26Repairing /Strengthe...Repairing /Strengthening of the Internal roads with laying of paver block at a stretch of 1.5 KM approx and the remaining 1.2 KM approx with 40mm thick SDBC ,Tengakhat ITF ,including supply of all materials except Cement.डुलियाजानNo-29-04-2025 / 11:00 AM29-04-2025 / 14:00 PMविवरण
210CDC9057L26Construction of dust...Construction of dust free approach road leading to well No.NHK#603( L-1300.00 M) by 150mm GSB ,75 MM two layer WBM & 40mm SDBC. All materials supplied by contractor except cement.डुलियाजानNo-29-04-2025 / 11:00 AM29-04-2025 / 14:00 PMविवरण