| 181 | TPI00175KG | Hiring of Third-Part...Hiring of Third-Party Inspection (TPI) Agency services. | काकीनाडा | No | - | 28/08/2025 01:00 PM | 28/08/2025 03:00 PM | विवरण |
| 182 | CDC9983L26 | Construction of boun...Construction of boundary fencing with RBT, security barrack with 2 nos of Toilet, 1 no of Urinal and 1 no of Bathroom and 1 no Morcha and footpath for placement of static security at MKM 33 well plinth including electrification and supply of all materials except cement and CGI Sheets. Total Estimated Cost Rs. 49,87,590.61 (Execution cost Rs. 48,93,981.68 and Forest Royalty component Rs. 93,608.93). | डुलियाजान | No | - | 26/08/2025 11:00 AM | 26/08/2025 02:00 PM | विवरण |
| 183 | CGI9973L26 | Necessary miscellane...Necessary miscellaneous yearly maintenance painting, carpentry, plumbing, repair and renovation of OIL flats (7 Numbers i.e. 2B, 3B, 4B, 2A, 3A, 4A, 3F) at Shantiniketan Apartments under RT, Rangapani Terminal. | गुवाहाटी | No | - | 26/08/2025 11:00 AM | 26/08/2025 02:00 PM | विवरण |
| 184 | GCO9563L26 | HIRING SERVICES FOR ...HIRING SERVICES FOR FABRICATION/ REPAIR OF ENGINES, PUMPS, AND AUXILIARY EQUIPMENT UNDER MECHANICAL MAINTENANCE PS-8 SONAPUR BASE FOR A PERIOD OF TWO (2) YEARS AND EXTENDABLE BY ANOTHER ONE (1) YEAR. (LIMITED TENDER BASIS). | गुवाहाटी | No | - | 25/08/2025 02:00 PM | 25/08/2025 02:00 PM | विवरण |
| 185 | CDC9916L26 | Widening of existing...Widening of existing bituminous road with 150mm GSB, 150mm WBM, 50mm Dense Graded Bituminous Macadam (DBM) and 40 MM thick Semi-Dense Bituminous Concrete (SDBC) from Paanch Ali near OIEEA office to Kalibari Chariali (approx. length= 1.11 KM)including supply of all materials except cement. | डुलियाजान | No | - | 21/08/2025 11:00 AM | 21/08/2025 02:00 PM | विवरण |
| 186 | CDC9914L26 | Repairing of existin...Repairing of existing bituminous road with 50mm Dense Graded Bituminous Macadam (DBM) and 25 MM thick Semi-Dense Bituminous Concrete (SDBC) from Chariali near C10 to Helipad Tiniali via B Type Puja Mandap (approx. length 0.91 KM)including supply of all materials except cement. | डुलियाजान | No | - | 21/08/2025 11:00 AM | 21/08/2025 02:00 PM | विवरण |
| 187 | CDC9913L26 | Repairing of existin...Repairing of existing 1960.00Mtr long Approach Road, repairing/construction of existing plinth/hardstanding area, cleaning/desilting of Effluent pits, construction of dwarf wall & construction of Foundation to Suit E-1400 AC/SCR Rig Outfit for any drilling location in CF-EAST SECTION. | डुलियाजान | No | - | 21/08/2025 11:00 AM | 21/08/2025 02:00 PM | विवरण |
| 188 | CGI9629L26 | Construction of boun...Construction of boundary fencing (length: 600M plus 600M=1200M) for quarters and bungalows at Domestic PS8 Sonapur. | गुवाहाटी | No | - | 20/08/2025 11:00 AM | 20/08/2025 02:00 PM | विवरण |
| 189 | CGI9716L26 | Revamping of road at...Revamping of road at RS-5 Jagiroad & RS-8, Nalbari (Balance Part) including supply of all materials | गुवाहाटी | Yes | - | 19/08/2025 01:30 PM | 19/08/2025 02:00 PM | विवरण |
| 190 | CGI9737L26 | NECESSARY BEAUTIFICA...NECESSARY BEAUTIFICATION OF RIGHT OF WAY OF OIL NEAR DISPUR SECRETARIAT IN GUWAHATI, ASSAM | गुवाहाटी | No | - | 19/08/2025 11:00 AM | 19/08/2025 02:00 PM | विवरण |