तक

409.20

NSE

410.55

BSE
  • तक
  • 409.20NSE
  • 410.55BSE

सीमित निविदाएँ

Profile
Last updated: 29 Sep, 2025 03:31 PM

पुरालेख निविदाएँ (सीमित निविदाएँ)

सीरीयल नम्बरनिविदा नंबरशीर्षकस्थान/कार्यालयचिह्नित किए गए ?बोली पूर्व तारीखबोली बंद करने की तारीख और समयबोली खोलने की तारीख और समयविवरण
101CDC9059L26Repairing /Strengthe...Repairing /Strengthening of the Internal roads with laying of paver block at a stretch of 1.5 KM approx and the remaining 1.2 KM approx with 40mm thick SDBC ,Tengakhat ITF ,including supply of all materials except Cement.DuliajanNo-29-04-2025 / 11:00 AM29-04-2025 / 14:00 PMविवरण
102CDC9057L26Construction of dust...Construction of dust free approach road leading to well No.NHK#603( L-1300.00 M) by 150mm GSB ,75 MM two layer WBM & 40mm SDBC. All materials supplied by contractor except cement.DuliajanNo-29-04-2025 / 11:00 AM29-04-2025 / 14:00 PMविवरण
103CDC9042L26Repairing of CISF Ba...Repairing of CISF Barracks which includes replacement of CGI sheet (through PPGL),ceiling,repairing of floor area of barracks,fixing of gates,(Vide Ref.No. PSS/ITF/Civil/24-113 Dated.09.09.2024).All materials supplied by contractor except cement.DuliajanNo-24-04-2025 / 11:00 AM24-04-2025 / 14:00 PMविवरण
104SSH8865L25SPARES FOR BHEL TYPE...SPARES FOR BHEL TYPE E-1400 DRAWWORKSDuliajanYes-23-04-2025 / 11:00 AM23-04-2025 / 14:00 PMविवरण
105SSG8863L25SPARES FOR E-1400 DR...SPARES FOR E-1400 DRAWWORKSDuliajanYes-23-04-2025 / 11:00 AM23-04-2025 / 14:00 PMविवरण
106SSG8836L25SPARES FOR BHEL TYPE...SPARES FOR BHEL TYPE E-1400 DRAWWORKSDuliajanYes-23-04-2025 / 11:00 AM23-04-2025 / 14:00 PMविवरण
107CDC9032L26Construction of the ...Construction of the approach road, plinth and foundation to Suit S-1 to S-7 Rig outfit on Cluster basis for any Location in Tangakhat & Chabua area or any area under CENTRAL FIELD WEST in Dibrugarh District ,including supply all material except cement and Bitumen drum sheets.DuliajanNo-22-04-2025 / 11:00 AM22-04-2025 / 14:00 PMविवरण
108CDC8991L26Construction of Stor...Construction of Storm water drains for new production facility inside Barekuri QPS with supply of all materials except cement. Total Estimated Cost Rs. 3790703.22 (Execution cost Rs. 3701858.61and Forest Royalty component Rs. 88844.61).DuliajanNo-22-04-2025 / 11:00 AM22-04-2025 / 14:00 PMविवरण
109CDC8911L25Strenthening the gra...Strenthening the gravel approach road to Loc MKE at Hahkhati, Kakopather by spreding two layers of WBM course each of 75 mm compacted thickness and blacktopping the road Providing 40mm SDBC surface from Hahkhaiti Namghar Tinali to Loc#MKE for a length of 1.4KM(approx)DuliajanNo-22-04-2025 / 11:00 AM22-04-2025 / 14:00 PMविवरण
110CDC8920L25Construction/modific...Construction/modification of approach road, plinth and foundation to Suit S-1 (E-1400) Rig outfit on cluster basis in any existing location in Dikom and Kathaloni area or any area under CENTRAL FIELD WEST in Dibrugarh District ,including supply all material except cement and Bitumen drum sheetsDuliajanNo-22-04-2025 / 11:00 AM22-04-2025 / 14:00 PMविवरण