| सीरीयल नम्बर | निविदा नंबर | शीर्षक | स्थान/कार्यालय | बोली पूर्व तारीख | बोली बंद करने की तारीख और समय | बोली खोलने की तारीख और समय | विवरण |
|---|---|---|---|---|---|---|---|
| 31 | SDG7511P25 | Junk subJunk sub | डुलियाजान | - | 30-10-2024 / 11:00 AM | 30-10-2024 / 14:00 PM | विवरण |
| 32 | OIL/GABON/CASING /267 /2024 | SUPPLY OF VARIOUS SI...SUPPLY OF VARIOUS SIZES OF CASING AT LOCATION C ( RONGULLA), NEAR FOUR PLACE, GABON | गैबॉन | - | 24-10-2024 / 14:00 PM | 24-10-2024 / 14:30 PM | विवरण |
| 33 | SDG6779P25 | Logging While Fishin...Logging While Fishing/Retrieving) Equipment, Qty 2 Sets | डुलियाजान | 04-07-2024 | 03-10-2024 / 11:00 AM | 03-10-2024 / 14:00 PM | विवरण |
| 34 | CDG6898P25 | Hiring of Services f...Hiring of Services for 2D Seismic Data Acquisition of 4300 LKM in Rajasthan Basin i.e Area-1 and 5100 LKM in Ganga-Punjab Basin i.e. Area-2 under Mission Anveshan | डुलियाजान | 17-07-2024 | 16-09-2024 / 11:00 AM | 16-09-2024 / 14:00 PM | विवरण |
| 35 | SDG6788P25 | Supply and Installat...Supply and Installation & Commissioning of Tabletop Powder X-ray Diffractometer | डुलियाजान | - | 31-07-2024 / 11:00 AM | 31-07-2024 / 14:00 PM | विवरण |
| 36 | SDG6640P25 | Fishing ToolsFishing Tools | डुलियाजान | - | 10-07-2024 / 11:00 AM | 10-07-2024 / 13:00 PM | विवरण |
| 37 | SDG6522P25 | Internal Casing Cutt...Internal Casing Cutter | डुलियाजान | - | 26-06-2024 / 11:00 AM | 26-06-2024 / 13:00 PM | विवरण |
| 38 | SDG6502P25 | PUMP PRESSURE ASSEMB...PUMP PRESSURE ASSEMBLY & PISTON SEPERATOR FOR MUD PUMP PRESSURE SYSTEM | डुलियाजान | - | 26-06-2024 / 11:00 AM | 26-06-2024 / 13:00 PM | विवरण |
| 39 | CDG5781P24 | Hiring enhanced Real...Hiring enhanced Real Time Monitoring & Analytics Center (e RTMAC) for monitoring drilling operations in 18 (Eighteen) Rigs of OIL with a provision to hire the service for additional rigs, along with associated application software and hardware including personnel, for a period of 04 (Four) years | डुलियाजान | 14-03-2024 | 25-06-2024 / 11:00 AM | 25-06-2024 / 14:00 PM | विवरण |
| 40 | CDG1979P23 | Hiring of Integrated...Hiring of Integrated Drilling Services (IDS 1) for Extended Reach Drilling (ERD), Highly Deviated Drilling (HDD) | डुलियाजान | - | 30-05-2024 / 11:00 AM | 30-05-2024 / 14:00 PM | विवरण |