| 71 | CDC0356P26 | Re Construction/ Dev...Re Construction/ Development of gravel approach road 100.00 mtrs. including WBM reparing of existing approach road , construction of plinth, road over plinth, effluent pits with suitable bundhs/embankment etc,cleaning of plinth, construction CC/RCC foundations with pillow foundation to Suit E-1400 rig out fit for any location in JNK area including supply of all materials except cement. | डुलियाजान | - | 30/10/2025 11:00 AM | 30/10/2025 02:00 PM | विवरण |
| 72 | CDC0316P26 | Construction of Appr...Construction of Approach road, Plinth, Road over Plinth, Effluent pit, Flare pit, CC/RCC foundation as per 2000 AC/SCR Rig including supply of all materials & equipment for Drilling Location OSTA, South Tripura under the Block: AA-ONHP-2018/,Tripura. | डुलियाजान | - | 30/10/2025 11:00 AM | 30/10/2025 02:00 PM | विवरण |
| 73 | CDC0334P26 | Construction of New ...Construction of New RBT fencing along with Gate Facility in 50 nos. OIL & GAS well plinth under Central asset (Kathalguri & Langkashi area) including supply of all materials except cement. | डुलियाजान | - | 28/10/2025 11:00 AM | 28/10/2025 02:00 PM | विवरण |
| 74 | CDC0303P26 | Construction of bric...Construction of brick boundary wall at Deroi EPS (Length- Approx. 650.0 Mtr, Height -12 ft plus 2 ft Y shaped overhang with Concertina coil).Total Estimated Cost Rs.1,89,09,343.80 (Execution cost Rs.1,84,66,156.06 and Forest Royalty Component Rs. 4,43,187.74) | डुलियाजान | - | 21/10/2025 11:00 AM | 21/10/2025 02:00 PM | विवरण |
| 75 | CDC0289P26 | Construction of Appr...Construction of Approach road, Culvert, Plinth, Road over Plinth, Eff-pit, CC/RCC foundation etc. to suit E-2000 AC/SCR Rig including supply of all materials & equipment for drilling location OBCA, Uttar Chatrang Majgaon Village,Gohpur, Biswanath, Assam under OALP Round-V Block: AA-ONHP-2019/1. | डुलियाजान | - | 16/10/2025 11:00 AM | 16/10/2025 02:00 PM | विवरण |
| 76 | CJI0287P26 | Construction of vari...Construction of various Drilling Locations including preparation of Plinths, campsites, Foundation castings and other miscellaneous civil works in Cambay Basin, Gujarat for a period of 2 (Two) years 2025-27 | जोधपुर | - | 10/10/2025 11:00 AM | 10/10/2025 03:00 PM | विवरण |
| 77 | CDC0246P26 | Construction of new ...Construction of new approach road of length approx. 800 m, construction of new Plinth, Dwarf wall, Hard Standing Area, effluent pit, construction of CC/RCC Foundation to suit CH-14 (Jaybee) E-2000 rig outfit in Chongkham/Kumchai area or in any location/multiple locations in Arunachal Pradesh including supply of all materials except cement. | डुलियाजान | - | 09/10/2025 11:00 AM | 09/10/2025 02:00 PM | विवरण |
| 78 | CDC0135P26 | Development of Appro...Development of Approach Road, Construction of Well plinth including perimeter dwarf wall, Road over plinth, construction of CC/RCC Foundation to suit E-1400 AC/SCR Rig outfit at any other drilling location at Dikom, Kathalani area in Dibrugarh district including supply of all materials by the contractor except Cement & empty bitumen drum sheets. | डुलियाजान | - | 30/09/2025 11:00 AM | 30/09/2025 02:00 PM | विवरण |
| 79 | CDC0169P26 | Construction of 820 ...Construction of 820 mtr long Brick boundary wall of 3.6 Mtr Height & 0.6 mtr Y-hang Concertina Coil, around the Periphery of Production installation of WHS-LOC: HXR including supply of all materials by the Contractor except Cement, at Sessabil area, Dibrugarh. | डुलियाजान | - | 25/09/2025 11:00 AM | 25/09/2025 02:00 PM | विवरण |
| 80 | CDC0099P26 | Repair of road from ...Repair of road from NH-37 Makum Bypass to SCM 4 well to Barekuri OCS-QPS connecting road in Barekuri area by GSB, WBM, 40 mm thick SDBC work & replacing damaged culverts including supply of all equipment & materials. | डुलियाजान | - | 19/09/2025 11:00 AM | 19/09/2025 02:00 PM | विवरण |